Concept Plan Lines

Concept Plan Line drawings are being developed for 19 sites around Los Altos.  The Concept Plan Line drawings will help the City begin discussions with Los Altos residents regarding potential traffic calming and bicycle-pedestrian enhancements within their neighborhoods.

Concept Plan Line drawings for the following locations are planned as part of the Complete Streets Master Plan project.

No.StreetLimitsStatus
1Almond AveSan Antonio Rd to El Monte AveStage 1: Complete – Built in 2020
Stage 2: Planned Construction – Spring 2021
2Alvarado AveSan Antonio Rd to Casita WayPreliminary Drawings Available
3Casita WayJardin Dr to Marich WyPreliminary Drawings Available
4Clark AveEl Monte Ave to Cuesta DrPreliminary Drawings Available
5ACovington RdPhase 1
El Monte Ave to Miramonte Ave
Complete – Built in 2020
5BCovington RdPhase 2
El Monte Ave to Springer Ave
Planned Construction – Spring 2021
6Covington RdPhase 3
Miramonte Ave to Grant Rd
Preliminary Drawings Available
7Distel DrJardin Dr to El Camino RealPreliminary Drawings Available
8El Camino RealEntire City LimitsPreliminary Drawings Available
9Gordon WayAlmond Ave to Hawthorn AvePreliminary Drawings Available
10Grant RdFoothill Exp to Homestead RdPreliminary Drawings Available
11Jardin DrValencia Dr to Alicia WyPreliminary Drawings Available
12Jordan AveSan Antonio Rd to El Camino RealPreliminary Drawings Available
13Los Ninos WyJardin Dr to Marich WyPreliminary Drawings Available
14Loyola CornersFremont-Miramonte-A StPreliminary Drawings Available
15Marich WyJordan Ave to Casita WyPreliminary Drawings Available
16Miramonte Ave & Berry AveIntersection Hot SpotPreliminary Drawings Available
17Panchita WyJardin Dr to Marich WyPreliminary Drawings Available
18Valencia DrArbuelo Wy to Almond AvePreliminary Drawings Available
19St Joseph AveFoothill Expressway to Rancho San Antonio ParkPreliminary Drawings Available
20Alicia WayJardin Dr to Almond AvePreliminary Drawings Available

Los Altos 2021 Summer Street Resurfacing Program

The City of Los Altos will be resurfacing the following street segments in the Summer 2021. Bicycle- and pedestrian enhancements are planned as part of the construction. The City is requesting input from residents on the following drawings. Check this site regularly for updates following public input.

StreetLimitsStatus
ACampbell AvenueCuesta Drive to Fremont AvenuePreliminary Drawings Available
BEastwood DriveCovington Road to Miramonte AvenuePreliminary Drawings Available
CFremont AvenueSpringer Road to Dolores AvenuePreliminary Drawings Available