Concept Plan Lines
Concept Plan Line drawings are being developed for 19 sites around Los Altos. The Concept Plan Line drawings will help the City begin discussions with Los Altos residents regarding potential traffic calming and bicycle-pedestrian enhancements within their neighborhoods.
Concept Plan Line drawings for the following locations are planned as part of the Complete Streets Master Plan project.
No. | Street | Limits | Status |
---|---|---|---|
1 | Almond Ave | San Antonio Rd to El Monte Ave | Stage 1: Complete – Built in 2020 Stage 2: Planned Construction – Spring 2021 |
2 | Alvarado Ave | San Antonio Rd to Casita Way | Preliminary Drawings Available |
3 | Casita Way | Jardin Dr to Marich Wy | Preliminary Drawings Available |
4 | Clark Ave | El Monte Ave to Cuesta Dr | Preliminary Drawings Available |
5A | Covington Rd | Phase 1 El Monte Ave to Miramonte Ave | Complete – Built in 2020 |
5B | Covington Rd | Phase 2 El Monte Ave to Springer Ave | Planned Construction – Spring 2021 |
6 | Covington Rd | Phase 3 Miramonte Ave to Grant Rd | Preliminary Drawings Available |
7 | Distel Dr | Jardin Dr to El Camino Real | Preliminary Drawings Available |
8 | El Camino Real | Entire City Limits | Preliminary Drawings Available |
9 | Gordon Way | Almond Ave to Hawthorn Ave | Preliminary Drawings Available |
10 | Grant Rd | Foothill Exp to Homestead Rd | Preliminary Drawings Available |
11 | Jardin Dr | Valencia Dr to Alicia Wy | Preliminary Drawings Available |
12 | Jordan Ave | San Antonio Rd to El Camino Real | Preliminary Drawings Available |
13 | Los Ninos Wy | Jardin Dr to Marich Wy | Preliminary Drawings Available |
14 | Loyola Corners | Fremont-Miramonte-A St | Preliminary Drawings Available |
15 | Marich Wy | Jordan Ave to Casita Wy | Preliminary Drawings Available |
16 | Miramonte Ave & Berry Ave | Intersection Hot Spot | Preliminary Drawings Available |
17 | Panchita Wy | Jardin Dr to Marich Wy | Preliminary Drawings Available |
18 | Valencia Dr | Arbuelo Wy to Almond Ave | Preliminary Drawings Available |
19 | St Joseph Ave | Foothill Expressway to Rancho San Antonio Park | Preliminary Drawings Available |
20 | Alicia Way | Jardin Dr to Almond Ave | Preliminary Drawings Available |
Los Altos 2021 Summer Street Resurfacing Program
The City of Los Altos will be resurfacing the following street segments in the Summer 2021. Bicycle- and pedestrian enhancements are planned as part of the construction. The City is requesting input from residents on the following drawings. Check this site regularly for updates following public input.
Street | Limits | Status | |
---|---|---|---|
A | Campbell Avenue | Cuesta Drive to Fremont Avenue | Preliminary Drawings Available |
B | Eastwood Drive | Covington Road to Miramonte Avenue | Preliminary Drawings Available |
C | Fremont Avenue | Springer Road to Dolores Avenue | Preliminary Drawings Available |